Certificate/Reg.-No. | 968/FSA 1205.00/20 |
Type of Certificate | FSA Certificate |
Certificate Holder | Burullus Gas Company |
Product Category | Safety Instrumented Systems / SRECS / Safety Functions > HIPPS |
Subject | Burullus Project WDDM Phase IXb - High Integrity Pressure Protection System (HIPPS) 517 bar Unit |
Type Designation | HIPPS Manifold Part Number: ALJ-27001-01 HIPPS Manifold Serial Number. 445570003-01 |
Codes and Standards |
|
Scope and Result | Assessment of the design, engineering and system integration (up to the EFAT stage in Norway) of the Baker Hughes - Burullus HIPPS (517 bar unit). The corresponding life cycle phases are: phase 4 of IEC 61511 (stage 2 assessment). The final subsea installation and commissioning is not covered. The presented HIPPS design, engineering and validation activities comply with the requirements for SIL 3 of the applicable life cycle phases. |
Specific Provisions | The instructions of the associated Installation, Operating and Safety Manual must be considered. The instructions given by the HIPPS supplier and the safety documentation delivered by the component suppliers have to be observed. Mode of operation: Low Demand Mode, Proof test interval: 1 year (full test), Design lifetime: 25 years, PFDavg = 1.20E-04. For details see test report 968/FSA 1205.00/20. |
Valid Until | no expiry date |
Appendixes | n/a |
Download Certificate | 968_FSA_1205_00_20_en_el.pdf |
Certificate/Reg.-No. | Certificate Holder | Product Category | Product Tested | Type Designation | Details |
---|
Remark: In case of missing entries this is due to restrictions by the certificate holder