Certificate/Reg.-No. | 968/GI 1771.01/23 |
Type of Certificate | GI Certificate |
Certificate Holder | Capstone Green Energy |
Product Category | Grid Automation > Grid Integration FGWTR8EZE |
Subject | Micro-Turbine power generating system (CHP) C200S, C400S, C600S, C800S, C1000S |
Codes and Standards |
|
Scope and result | The power generating units mentioned above meet the requirements of VDE-AR-N 4110:2018-11. The conformity is declared by following documents: Report-No.: 968/GI 1771.01/23, dated 2023-06-16 Validation Report-No.: 968/GI 1771.00/23, dated 2023-06-05 Test Report No.: IT22H59S 001, dated 2023-06-12 The manufacturer has provided proof of certification of the quality management system of his production facility in accordance with ISO 9001 |
Specific provisions | The deviations and conditions for conformity according to the evaluation report must be observed. The corresponding conditions and deviations are listed on page 3 of the certificate. |
Validity | 2028-06-16 |
Appendixes | n/a |
Download Certificate |
968_GI_1771_01_23_en_el.pdf 968_GI_1771_01_23_de_el.pdf |
Certificate/Reg.-No. | Certificate Holder | Product Category | Product Tested | Type Designation | Details |
---|
968/GI 1771.01/23 | Capstone Green Energy | Grid Automation → Grid Integration FGWTR8EZE | Micro-Turbine power generating system (CHP) C200S, C400S, C600S, C800S, C1000S | n/a | View Details | View PDF |
Remark: In case of missing entries this is due to restrictions by the certificate holder